Promek AMC for Data Centres

Defuse the Capex Timebomb. Meet the 25-Year Data Centre Chiller.

By pairing Cloudburst’s Smartmist precooling with Promek AMC coating, we extend chiller lifespans to 25 years, cut energy use by up to 12%, and protect your uptime on the hottest days of summer.

40+1500 kW data centre chillers already protected in Sydney
Data centre chiller cooling protected by Promek Promek AMC protective coating
25 yearsTarget chiller lifespan
Up to 12%Energy saving with precooling
8–12%Efficiency regained on older coils
40+1500 kW chillers protected
The mid-life chiller crisis

High risks and rising costs

Air-cooled chillers are the data centre standard because they avoid the installation cost, water treatment and Legionella risk of cooling towers. But running 100% uptime on air-cooled plant comes with a ticking clock.

Risk 01
$30M–$40M

The Capex Timebomb

Most chillers last just 15 to 20 years. At up to $500,000 per chiller, a facility with 60 to 80 units faces a staggering replacement cycle.

Risk 02
$30,000

The Coil Trap

Mid-life degradation and corrosion force coil replacements. A single 1500 kW chiller can have up to 20 coils, and replacing just one costs around $30,000.

Risk 03
60% → 100%

The Peak-Summer Threat

Chillers typically run at 60% of Effective Full Load Current (EFLC). On high-ambient days demand spikes to 100%, and scaled or corroded coils push operating pressures towards a trip when you can least afford it.

12%

Energy reduction that misting systems can deliver on peak summer days.

The catch with misting

Efficiency today, damage tomorrow

To solve the summer peak problem, many facilities turn to misting. But raw misting destroys the chiller from the outside in, within just a few years:

1
Aluminium fin corrosionConstant water contact attacks exposed fins and shortens coil life.
2
Calcium scalingEvaporating water leaves mineral deposits that insulate the coil and raise operating pressure.
The innovation

Precooling efficiency meets total corrosion protection

Promek delivers the world’s first unified solution: leading USA precooling technology paired with our advanced Australian-engineered thermal coating.

Smartmist by Cloudburst

The Power
High-pressure precooling technology, made in the USA since 1994
  • Instant precooling. Drops ambient air temperature before it hits the coils.
  • Proven savings. Reduces overall chiller energy consumption by up to 12%.
  • Trip prevention. Relieves operating pressure during peak ambient conditions.
+

Promek AMC Coating

The Shield
Australian-engineered protective coating
  • Thin-film protection. Applied at just 12–16 microns, so coils keep transferring heat as designed.
  • Corrosion & scale immunity. Formulated to stop the fin corrosion and calcium scaling caused by water evaporation.
  • Efficiency boost. A baseline 2% saving on new coils and 8–12% recovery on older, degraded coils.
See it working

Smartmist in action

Together they unlock a 25-year chiller lifespan, a global first in data centre infrastructure.

Talk to an Engineer
Inside Smartmist

Precision precooling, fully automated

Next-generation evaporative cooling from Cloudburst, engineered to keep critical equipment available through the hottest months of the year.

Cloudburst high pressure mist technical concepts: psychrometric chart and misting nozzle
The science

Built on the psychrometric chart

The psychrometric chart is the scientific foundation for analysing the thermodynamic properties of air, including how much moisture it can absorb. Smartmist uses this principle to add exactly the right amount of ultra-fine mist to cool the incoming air.

  • Protects availability in summer by improving the chiller’s Delta T.
  • Increases efficiency and capacity in high-temperature conditions.
  • Restores design conditions by bringing air temperature and density closer to what your chillers were designed for.
How the Cloudburst high pressure mist system works: sensors, adjustable nozzle matrix and evaporation zone
The system

Sensors, control and an evaporation zone

Atmospheric sensors measure the outside conditions, and these readings set how much high-pressure mist is dosed through precision nozzles at strategic air inlet points.

The system PLC calculates the optimal amount of mist to saturate the air to the desired level, while the adjustable nozzle matrix is positioned for relative humidity conditions. The mist evaporates in the zone ahead of the coils, so the chillers receive colder, denser air.

A proprietary water treatment system combines multi-stage filtration with Solavite physical treatment, so potable town water can be used without demineralisation.

01

Sense

Atmospheric sensors continuously read ambient temperature and relative humidity.

02

Calculate

The system PLC works out the exact amount of mist needed to saturate the air to the target level.

03

Mist

1200 PSI pumps feed precision nozzles at the coil air inlets, with nozzle positions matched to humidity conditions.

04

Stage & Monitor

Four operating stages switch on and off to maximise efficiency and minimise water use, with remote monitoring over Ethernet/IP.

Cloudburst data centre advanced pre-cooling project layout: 2 mist zones, 20 lines, 160 nozzles
Data centre project layout: the mist system matrix runs across the cooler bank, fed by the Cloudburst mist system skid.
Sydney data centre project
2Mist zones
20Lines (10 per zone)
8Nozzles per line
160Nozzles total

Typical site services

  • WaterFresh water, 1″ feed, min. 30 PSI at 2.8 gpm
  • Power5 kW supply (3.5 kW installed load), single or three phase
  • ControlsEthernet/IP remote monitoring & operation

Engineered for critical plant

  • Solavite water treatment. Five-stage physical filtration allows potable town water to be used without demineralisation.
  • Low water consumption. Staged operation delivers only the mist the conditions call for.
  • 100% automated. Runs itself from sensor data, with pressures, temperatures, humidity and status reported remotely.
  • Non-invasive, modular install. Fits around your existing plant, with the mechanical layout customised to each site.
How it works

Minimum shutdown. Maximum lifecycle.

Upgrading your infrastructure shouldn’t compromise uptime. Our specialised application process is engineered for the zero-downtime demands of data centres.

Minimal Shutdown Time

Promek AMC application and Smartmist installation are executed with precision, chiller by chiller, causing minimal disruption to daily operations.

EFLC Optimisation

Lower thermal stress all year round reduces your annual Effective Full Load Current, dropping power bills and extending mechanical wear-life to 25 years.

Proven Track Record

This isn’t experimental. 40 major 1500 kW data centre chillers are already coated and operating at peak efficiency right here in Sydney.

Planned Maintenance

Annual maintenance of the misting system is required, and regular coil flushing keeps coils clean and performing as designed.

Water Analysis on Every Project

Town water supply is analysed on each project, giving you complete control of water treatment from day one. Solavite filtration means no demineralisation plant is needed.

The ROI

The numbers speak for themselves

Every year added to a chiller’s life defers a six-figure replacement. Across a full fleet, that is tens of millions in avoided capital spend.

MetricStandardWith Promek
Chiller lifespan15–20 years25 years
Energy consumptionBaselineUp to 12% lower
Coil performanceDegrading8–12% regained
Coil replacement$30k per coilMid-life replacements avoided

Chiller lifespan

Standard air-cooled chiller15–20 yrs
Replace
Smartmist + Promek AMC25 yrs
Protected & precooled
0510152025 yrs

Example: 60–80 chillers × up to $500,000 each is a $30M–$40M replacement cycle, deferred by 5 to 10 years.